There is a pattern I keep encountering in various organizations - be it personal or via friends. “Management” complains that progress is too slow. Projects are claimed to take too long, employees are claimed to be insufficiently productive and apparently they think nobody knows what anybody else is doing. The proposed solution is often more communication: another meeting, more frequent updates, a daily check-in or multiple check-ins and the expectation that questions will be answered immediately.
Spoiler: This is exactly the reason for low productivity in the first place and need to be fixed on the management side.
The people expected to deliver the work then spend more of their time keeping all information permanently recallable, preparing to explain it, explaining it and espcially also recovering from the explanation and social interaction. The work itself has to fit into whatever remains.
This response to low productivity is fundamentally backwards. In demanding technical and scientific work, repeated interaction consume the very capacity an organization is trying to obtain.
For some employees, a single meeting can effectively destroy most of a working day. If the discussion changes the task or the plan, the consequences can consume multiple days of productive work. An organization that ignores those costs can keep people permanently occupied while preventing them from making substantial progress. There simply is no such thing as a quick check-in, a short call or a quick standup meeting.

Out of experience it can take three or four hours at least after a meeting before productive work can be done again. A telephone call can have a similar effect. When a meeting changes something about the work, returning to productive work can take days. This is mainly due to the shift of focus and the change to a different domain of processing.
That experience makes the usual accounting of meetings rather absurd. A calendar entry shows thirty minutes. The organization treats the remaining hours as available. But those hours may often no longer contain the conditions needed to solve the problem one was working on, so it will be postponed to the next day.
Demanding work involves more than having a file open or looking busy. It involves keeping a complicated structure of assumptions, dependencies, partial conclusions and unresolved questions available in ones mind. Getting into the flow takes a significant amount of time. A programmer investigating an intermittent failure, a mathematician or physicist developing an argument or an engineer working through interacting constraints has to construct and maintain that structure.
An interruption displaces it very often. Returning requires reconstruction from scratch.
Sophie Leroys research on attention residue describes one part of this problem: attention can remain attached to a previous task after a person has switched to another. Unfinished work and anticipated pressure on returning to it can make that residue more likely. Opening the relevant document again does not establish that one’s attention has returned with it[1].
The cost also starts way before the appointment. Knowing that a meeting is approaching makes a long task difficult or impossible to begin. Tonietto, Malkoc and Nowlis found across multiple studies of scheduled boundaries that people perceived the time before an upcoming task as shorter and were less likely to undertake relatively extended tasks that would have fitted into it[2].
Preparation, anticipation, attendance and reconstruction can therefore spread a meetings consequences across much of the day. The practical result can be an almost completely lost day for the demanding work the employee was supposed to complete.
The calendar records attendance. It does not record the work that becomes impossible around it.
This is why the frequency of meetings also matters much. Five fifteen-minute meetings occupy seventy-five minutes on a weekly calendar. That says very little about their actual cost to someone who needs hours to recover from each interruption. The schedule imposes a disruption on every working day.
Shortening each meeting changes only the attendance time. It may barely change the cost of preparing for it, switching into it and reconstructing the interrupted work afterwards.
A concise meeting can still be destructive. An agenda can still divide the day at the wrong point. Finishing on time does not restore the attention displaced by attending.
The same problem can persist when meetings happen every two or three days. Some work needs several days with a stable objective and enough autonomy for an approach to develop. If those days are repeatedly interrupted by demands to report, explain, defend or change direction, the employee may never get far beyond reconstruction.
This does not require several days of continuous concentration without sleep or breaks. It requires continuity of the problem being worked on and control over when to set it aside. Rest chosen around the work and an externally imposed demand to switch context have different consequences.
Research on daily stand-ups has identified frequency as a problem in its own right. A study of software teams identified reporting to managers, excessive frequency and excessive duration among the factors contributing to negative attitudes. They clearly contradict the assumption that daily attendance is an innocuous default[3].
For an employee with a high disruption cost, a daily meeting can make productive work an exception squeezed into the remains of each day. Meetings every few days can still leave too little continuity for a demanding problem to develop into a result. Calling the meeting short does not address that problem.
The effect becomes more severe when a meeting changes the work itself.
For some employees, even a change that looks small to the person announcing it can cost many days of productive work. The change can leave one unable to regain productive momentum for several days. That cost belongs in the discussion just as much as the time spent attending.
There can also be substantial reconstruction within the work. An altered requirement may invalidate an assumption. That assumption may support a design choice, an experiment, a calculation or an implementation strategy. The consequences then have to be traced before the work can proceed coherently.
In software, for example, a small interface change often requires reconsidering dependencies and failure modes. In an experiment, a revised objective can change the necessary controls, the measurement sequence and what the resulting data would establish. A design adjustment can affect assembly, tolerances or the space available for other components.
The person making the announcement may be finished after a sentence and feel important or productive. The person doing the real work, implementing its consequences has only just begun.
During that period, substantial effort may produce very little forward progress. The employee is restoring a coherent basis for work under the altered conditions. That effort is easily mistaken for slow performance if the organization records the new instruction but fails to record what it displaced.
Now repeat the intervention every two or three days.
If absorbing a change takes several days, the next intervention can arrive even before the consequences of the previous one have been worked through. The employee spends an increasing part of the project reconstructing an approach that will be altered again before it can produce a result.
The original deadline, that often was unrealistic even in the first place, may remain on the plan throughout.
The cost of changing direction belongs to the decision that changed it. It cannot honestly be assigned afterwards to an employees supposed lack of productivity.
Meetings also generate work before anybody joins them.
A person may have to turn unfinished reasoning into a presentation, assemble a demonstration, produce estimates, summarize uncertainty and explain why the current problem has not yet been resolved. These demands can consume the same attention that would otherwise go into resolving it. And they are again a disruption that may lead to hours of unrproductivity after doing the short note or report.
This is especially awkward in research and difficult engineering. Progress is not guaranteed to arrive in tidy tiny increments suitable for daily or weekly presentation. A substantial result may emerge only after several unsuccessful approaches have been understood and ruled out.
Requiring a fresh account every morning creates pressure to make the work presentable every morning. Time is redirected toward explanations, visible intermediate products and predictions that may have no basis while the underlying problem remains unresolved and gets postponed.
The organization then becomes good at producing evidence that work is being discussed.
The duplication can be considerable. Notes exist in the place where the work happens. The same information is copied into a tracker, rewritten for a status report, placed on slides, written down in timesheets and recited in a meeting. Each retelling requires someone to select, translate and defend information already recorded elsewhere.
Preparing an explanation requires rebuilding the context. A request that takes a manager seconds to formulate often demands a substantial interruption from the person answering it.
Reducing meeting duration while retaining all these surrounding obligations leaves much of the burden intact.
The resulting cycle is easy to construct.
Progress appears slow, so management requests more updates. Those updates consume working time and interrupt concentration. Less work gets completed, which produces greater concern about progress. The response is another layer of reporting and more frequent intervention.
Eventually the organization spends a remarkable amount of effort investigating a shortage of progress that its own working arrangements help sustain.
Leslie Perlows qualitative study of a software engineering team described a closely related pattern. Interruptions, a crisis mentality and rewards for individual heroics helped perpetuate the teams shortage of time. The problem was embedded in how people affected one anothers work. web.mit.edu
There is an asymmetry in this arrangement. The person asking a question receives an answer immediately. The person answering may carry the consequences for hours.
If the requester sees only the length of the exchange, the interruption appears cheap. If the recipient explains that it has consumed much of the day, that explanation may itself be treated as a problem with the recipient, which is a convenient way to make an organizational cost disappear from the organizations account - but has nothing to do with reality.
For a hypothetical eight-person meeting lasting thirty minutes, attendance alone consumes four person-hours. If each participant also spends two hours preparing, the total reaches twenty person-hours before any loss of concentration is considered - that may go up to 60 hours or more lost. A meeting organizers thirty-minute calendar slot is an inadequate description of that expenditure.
The demand that everyone should know what everyone else is doing deserves scrutiny.
In a complex project, keeping every participant continuously informed about everybody elses current work - especially in a visible way - creates a large amount of explanation and listening. Much of that information arrives at people who have no immediate reason to act on it.
The organization pays for this awareness with the attention of the people carrying out the work.
A person needs to know the constraints and dependencies relevant to their task. They need to find an existing decision, understand an interface or obtain a particular result. Turning those specific needs into a standing obligation to hear everyones progress is an expensive expansion of the requirement.
The same issue applies to telephones and chat.
A telephone call claims the recipients attention at a time chosen by the caller. A message that is expected to receive an immediate response creates a similar demand. The software may support asynchronous communication, but the working arrangement remains interruptive.
Replacing a daily meeting with mandatory daily messages preserves much of the same burden. Replacing a call with a stream of notifications fragments the day just as thoroughly.
People should be able to leave information where it belongs and allow others to consult it when needed. Maintaining the records required for the work should not automatically create an obligation to reproduce them in several reporting channels.
A managers desire to know something immediately does not establish that obtaining it immediately is worth the interruption or the correct way to progress. Developing patience is the better way.
The costs described here are not identical for every person.
Some employees can resume a task quickly. Others need hours before demanding work becomes possible again. Some are particularly affected by changes to the task or agreed plan and need days to regain productive momentum.
An organization cannot reasonably take the experience of the employee least affected by interruptions and use it as a scheduling standard for everyone else.
If someone was hired for the ability to understand a difficult system, develop a rigorous argument or solve a complicated technical problem, the organization has to provide conditions in which that ability can be used. Constant availability may directly interfere with the capacity it hired.
Calling for greater flexibility is nice but does not work. It is the invalid attempt to simply transfer responsibility for the consequences to the person suffering them.
The problem is also not solved when an employee eventually completes the work at night or over the weekend (which they usually often do). In that case, private time has absorbed the consequences of the working arrangement. Judging only the eventual result conceals how it was obtained.
An employee should not have to recover a working day in the evening or do all the weeks work on the weekend because the organization spent the daytime asking about their progress.
This also changes how an empty calendar should be interpreted. Empty time is the space in which the employee can finally do the work. Treating it as unused capacity available for another appointment defeats its purpose.
The practical response should begin with removing obligations that repeatedly break productive work.
Cancel routine daily status meetings. Review meetings every two or three days with the same seriousness, especially where employees report that the disruption lasts well beyond the appointment. A recurring calendar entry is not evidence that the underlying need recurs at that frequency.
Protect whole weeks with stable priorities, without different tasks each day and no routine reporting demands. Scattered gaps between appointments are an inadequate substitute for that continuity.
End the expectation that ordinary questions receive immediate answers. State the actual question, provide the context and identify when an answer is needed (in units of weeks, not in minutes or hours). Allow the recipient to choose a point at which responding causes less damage.
Remove duplicate reporting. Use the notes, results, issue records and other material the work already requires. Stop making employees translate the same state into several formats for several audiences.
Make the cost of changes visible before issuing them. Record what must be reconsidered, what work will be displaced and what happens to the expected completion date. Even a short instruction can create days of consequences.
Evaluate completed work, its quality, and the amount of rework. Fast replies and full calendars are poor substitutes for those outcomes. An employee who is constantly available may be constantly prevented from doing the hardest part of the job.
Most of all, stop treating an uninterrupted working week as a special concession. It is a basic requirement for productive work.
There are employees for whom one meeting consumes nearly the whole days capacity for demanding work. There are employees for whom a change to the task or plan costs days before productive work can resume.
Organizational arrangements have to account for those people as they actually work.
Daily meetings can impose the disruption every day. Meetings every two or three days can repeatedly intervene before the work has regained continuity. Continuous calls, messages and requests for updates can fill whatever gaps remain.
Under those conditions, a complaint about low productivity should begin with an examination of what the organization keeps imposing on its employees.
If you want difficult work completed, leave enough time for people to understand the problem, develop an approach, and finish it. Stop taking that time away in order to ask why they have not finished yet.